Risk Manager for YouTrack
Risk Manager helps Risk Managers identify, assess, prioritize, monitor, and report risks directly in YouTrack. The app adds a project-level Risk Registry, visual Risk Matrix, Risk Severity Gauge, ROAM tracking, statistics, and framework readiness checks so risk work stays connected to the issues and projects where teams already work.
Audience: This guide is for Risk Managers who use Risk Manager day to day to maintain a risk register, review risk exposure, coordinate mitigation, and prepare reporting for stakeholders.
Media guide
The screenshots below are the visual walkthroughs that were already attached to the page. Use them together with the written steps in this guide when explaining how to configure and operate Risk Manager.
Risk Manager screenshots
Video walkthrough
The Risk Manager-specific walkthrough video was not available in the page attachments or current search results. When the video URL is available, add it here as an embedded walkthrough for Risk Managers.
What Risk Managers can do with Risk Manager
Maintain a sortable, filterable, and groupable risk register for a project.
Assess risks using probability and impact fields, including inherent and residual risk where configured.
Track ownership, treatment decisions, mitigation actions, controls, and review dates.
Use the matrix and severity views to understand exposure and prioritize follow-up.
Use the ROAM Board to see whether risks are Resolved, Owned, Accepted, or Mitigated.
Check framework readiness for standards such as ISO 27001, ISO 31000, NIST RMF, NIST CSF 2.0, SOC 2, DORA, NIS2, and COSO ERM when enabled.
Where to find Risk Manager
Area | Where to open it | What Risk Managers use it for |
|---|---|---|
Risk Registry | Open a YouTrack project, then select the Risk Registry project tab. | Review, filter, group, and manage the project’s risks. |
Risk Matrix | Open the Matrix view in the Risk Registry or add the Risk Matrix widget to a dashboard. | Visualize probability × impact exposure and identify high-priority risks. |
Risk Severity Gauge | Open the Severity view or add the Risk Severity Gauge widget to a dashboard. | Monitor individual or portfolio-level exposure. |
ROAM Board | Open the ROAM Board view, if enabled for the project. | Track whether risks are Resolved, Owned, Accepted, or Mitigated. |
Framework Readiness | Open the Framework Readiness view, if enabled for the project. | Find gaps against selected risk and compliance frameworks. |
Risk Manager workflow
Confirm the project setup. Make sure the project has the Risk Registry enabled and that the required fields are mapped for probability, impact, ownership, treatment, mitigation, controls, and review scheduling.
Capture risks. Add or update YouTrack issues that represent risks. Include a clear title, description, category, owner, probability, impact, and treatment plan where applicable.
Assess risk severity. Use probability and impact values to score each risk. In Enterprise Risk mode, assess both inherent risk and residual risk so you can compare risk before and after controls.
Prioritize action. Use the Registry, Matrix, Severity, Statistics, and ROAM views to identify risks above tolerance, unowned risks, untreated risks, and risks due for review.
Track mitigation and controls. Link mitigation work, record treatment decisions, document controls, and keep review dates current.
Report and review. Use dashboards, registry views, and framework readiness checks to communicate exposure, progress, and gaps to stakeholders.
Using the Risk Registry
The Risk Registry is the main working area for Risk Managers. It turns risk issues into a practical risk register while keeping the risks inside YouTrack.
Registry view
Use sorting, filtering, and grouping to focus on specific owners, categories, severities, review dates, or treatment states.
Look for risks without owners, missing assessments, missing treatment decisions, or overdue reviews.
Use the register during risk review meetings as the source of truth for current project exposure.
Matrix view
Use the matrix to see which risks fall into low, medium, high, or critical exposure areas.
Start with the highest probability and highest impact risks when prioritizing mitigation.
In comparison mode, compare inherent and residual positions to understand whether controls reduce exposure.
Severity view
Use severity gauges to summarize portfolio exposure across the selected risk set.
Use Single mode when tracking one risk matched by a query.
Use Portfolio mode when rolling up every matched issue into one gauge value.
ROAM Board
The ROAM Board helps Risk Managers confirm that every significant risk has a clear disposition:
Resolved — the risk has been addressed and no longer requires active management.
Owned — a person or role is accountable for monitoring and action.
Accepted — the team has consciously accepted the risk within tolerance.
Mitigated — mitigation actions or controls are in place or in progress.
Statistics
Use Statistics to monitor operational quality of the register, including open risks, risks above tolerance, risks without owners, untreated risks, and risks not yet ROAMed.
Framework Readiness
When frameworks are enabled, Framework Readiness checks how complete your risk data is for selected standards. Click a framework to see category scores, gaps, and checklist rows marked as ready, partial, missing, informational, or not applicable. Use each gap as a prompt to update the related risk, registry data, or configuration.
Risk assessment models
Model | Use when | What to assess |
|---|---|---|
Project Risk | Your team uses one probability and impact assessment per risk. | Assess the current probability and impact for each risk. |
Enterprise Risk | Your organization compares risk before and after controls. | Assess inherent probability and impact, then residual probability and impact after controls. |
Recommended fields to maintain
Field area | Examples | Why it matters |
|---|---|---|
Assessment | Probability, Impact, Inherent Probability, Inherent Impact, Residual Probability, Residual Impact | Drives the matrix, severity gauge, and prioritization. |
Ownership | Risk owner, accountable team, assignee | Ensures every material risk has someone responsible for follow-up. |
Treatment | Accept, Avoid, Mitigate, Transfer; treatment plan; contingency plan | Shows how the organization intends to respond to the risk. |
Mitigation and controls | Linked mitigation issues, controls, control effectiveness, last assessed date | Provides evidence that risk response work is planned, active, and effective. |
Review | Review frequency, review date, last reviewed | Keeps the register current and supports recurring governance. |
Framework data | Framework categories, readiness indicators, required evidence | Supports compliance and audit readiness reporting. |
Typical review checklist for Risk Managers
Dashboard widgets
Add the Risk Matrix widget
Open a YouTrack dashboard.
Select Add widget.
Choose Risk Matrix.
Enter a query that defines which risks should be included.
Select the probability and impact fields used by the project.
Optionally enable comparison assessment for inherent vs. residual risk.
Add the Risk Severity Gauge widget
Open a YouTrack dashboard.
Select Add widget.
Choose Risk Severity Gauge.
Select the gauge mode: Single for one risk or Portfolio for a roll-up across matched risks.
Enter the query and field mapping for the risks to display.
Best practices for Risk Managers
Keep probability and impact values consistent across projects so portfolio reporting is meaningful.
Review high-severity and overdue risks first.
Do not leave material risks without an owner.
Use treatment decisions consistently: accept, avoid, mitigate, or transfer.
Link mitigation work and controls to the risk so evidence is easy to find.
Use residual risk to confirm whether mitigation is actually reducing exposure.
Run recurring risk review meetings from the Registry and Matrix views.
Use Framework Readiness to turn compliance gaps into concrete risk data improvements.
Troubleshooting
Issue | What to check |
|---|---|
A risk is missing from the registry or widget. | Check the project configuration and the query used by the Registry or widget. |
The matrix or gauge is empty. | Confirm that probability and impact fields are mapped and that the included issues have values. |
Comparison assessment is not shown. | Confirm that comparison assessment is enabled and that inherent and residual field mappings are configured. |
Framework readiness shows many gaps. | Open each gap and update the related risk data, controls, ownership, treatment, or review information. |
A user cannot access Risk Manager. | Check project permissions, app installation, and license status. Organizations with more than 10 users need a license in Administration → Integrations → Risk Manager Admin. |
Related help
Use the search below to find additional setup and configuration pages in this space.